Index measuring the simulation results
Amount of power to be generated from the generators 1~9 at Gyeongju Wind Power Plant 2 on the following day
*Conducting the development of the AI-based model predicting the amount of power generation. NADA Co., Ltd. developed the parts pertaining to the facility state monitoring and diagnosis of breakdowns.